Q Sine specialises in conducting PQA and makes analysis of the data. Based on which the solution is worked out.
Awareness about Power Quality has gained significance in the recent past. Deteriorated power quality leads to increased wear and tear in all electrical equipment. It’s damaging effect on the connected electrical / electronic loads is a concern for the cost center.
To understand the status of the Power Quality at the installation Power Quality Audit (PQA) is done periodically. The report of the PQA helps to mitigate the harmonics and PF related issues.
We study and capture following data during PQA;
Power Network System Measurements and Data Collection
- System Voltage RMS
- System Current RMS
- Active & Reactive Power
- Harmonic measurements along with specific harmonic filtering at normal operating conditions
- Three phase balancing study
- KVA Capacity Release
- Power Factor (Instantaneous)
- Data collection from site
- Voltage Improvement & stability study
- Surge & Transient Protection, study
- Broadband Harmonic reduction requirement, if any
Major Covered Parameters
Q Sine specialises in conducting PQA and makes analysis of the data. Based on which the solutions is worked out. We study and capture following data during PQA;
- Peak Voltage and Current
- Active, Reactive and apparent power per phase and their aggregate
- Active, Reactive energy - consumed and produced (export / import)
- Harmonics for voltage, current up to the 50th order
- Power factor. Displacement factor and Tangent
- Crest Factor for V and I & K factor for currents
- Frequency
- Flicker measurements
- Neutral current
- V and I unbalance in %
- Total Harmonic Distortion Factor & Inrush capture
- Transients recording
Common Problems Observed Due to Poor Power Quality
Other Services
Q Sine offers power quality enhancement & power continuity solutions
Annual Maintenance Contracts
We offer our specialised services for the equipment of various Brands and Makes.
Rental Equipment Services by Q Sine
We offer various Power equipment on rental basis (short and Long duration) to cater your requirement.
Arc Flash Study Services by Q Sine
Arc Flash Risk Assessment protects employees from electric arc flash hazards in industrial settings.
Short Circuit / Relay Coordination Study Services by Q Sine
Relay coordination study optimizes protection device settings to minimize faults and ensure reliable power.
Load Flow Analysis Services by Q Sine
Load Flow Analysis ensures proper sizing of cables, transformers, and voltage profile settings.
Industries we serve
Manufacturing
Automobile
Foundry
Hospitals
Packaging
Sugar Mills
Pharma
Datacenters
Textiles
FMCG
Agro Industries
Metal, Mineral & Mines
Case Studies
Sandvik Asia, Pune (End User)
- Load Details : Industrial machines
- Before condition : Initially Current THD was observed to be 15%.
- Solution / Proposal : Proposed 100 Amp AHF - 2 units
- After Solution : Current THD reduced to 6%
Sagar Manufacturers Pvt Ltd (SMPL), Bhopal
- Load Details : Spinning mill machines
- Before condition : Initially Current THD was observed to be 15%
- Solution / Proposal : Proposed 150 Amp AHF - 5 units and 300 Amp AHF - 6 units
- After Solution : Current THD reduced to 7%
Fresenius kabi India Pvt. Ltd, Pune
- Load Details : Machines Application (Pharma)
- Before condition : Power factor was a major concern which was about 0.97
- Solution / Proposal :Proposed 510 KVAR Hybrid panel with 400 KVAR RTPFC & 110 KVAR lead / lag step less power factor correction ( SVG ) Panel
- After Solution : PF improved to 0.995
Sampada Paper Mill, Sangli
- Load Details : Craft paper mill machines
- Before condition :Initially Current THD was observed to be 18% & VTHD 3.2%
- Solution / Proposal : Proposed 200 Amp AHF unit
- After Solution : Current THD reduced to 7% & VTHD reduced to 2.5%
Yash Industries Maharashtra
- Load Details : CNC machines
- Before condition : Power factor concern
- Solution / Proposal : Active correction of PF by SVG
- After Solution : PF improved to 0.995
Kisan Agro, Maharashtra
- Load Details : VFD and motors
- Before condition : Harmonics & Power factor concern
- Solution / Proposal : Active correction of PF by SVG and Harmonics by AHF
- After Solution : PF improved to 0.995 & met IEEE 519:2014 standard for Harmonics